Private procurement workspace

Compare quotes on the same basis.

RFQ EU-BTL-0926 · 20,000 pcs · Hamburg · Three offers normalized across incoterms, packaging, tooling, freight and compliance assumptions.

Quote normalization

Switch cost basis to see why the cheapest factory quote is not always the cheapest procurement outcome.

Decision factorNova MetalworksHorizon DrinkwareSummit Vacuum
Supplier fit96%92%89%
Quoted incotermEXWFOB NingboCIF Hamburg
MOQ1,0002,5003,000
Unit product price$2.84$3.08$3.72
Tooling/setup$280$0$420
Retail packagingIncludedIncludedIncluded
Lead time26–31 d29–35 d31–39 d
Compliance evidence94%88%90%
Normalized unit cost$4.16$4.23$4.31
Demo only: freight, duty and compliance costs shown are fictional. A production system would bind every figure to the source quote, calculation method and timestamp.
Recommended for current requirement

Nova Metalworks

Highest requirement fit, strongest evidence completeness and fastest observed production window. Slightly higher raw EXW than the lowest theoretical equivalent is offset by lower risk variance.

Risk: low–medium
Best commercial flexibility

Horizon Drinkware

No tooling setup in this quote and clear FOB terms. Evidence coverage on destination-specific food-contact scope still requires one clarification.

Risk: medium
Most complete freight offer

Summit Vacuum

CIF simplifies early budgeting, but longer production window leaves less schedule buffer against the buyer's delivery deadline.

Risk: medium

AI procurement explanation

Nova Metalworks is currently the strongest fit for this requirement because its verified capabilities match the requested bottle construction, its MOQ is well below the order quantity, its observed lead-time window leaves the largest schedule buffer, and its evidence package is the most complete for the destination. The system does not treat this as a universal “best supplier” label; it is a requirement-specific recommendation based on the current project's constraints and cited evidence.

Requirement v33 supplier quotesFactory audit 2026-08Observed lead-time data